Transforming Outdoor Spaces Across Bristol, Bath & Surrounding Areas

How to Plan Your Garden Transformation In Bristol, From Site Visit to Final Inspection

How to Plan a Complete Garden Transformation in Bristol

Summary

Every complete garden transformation in Bristol is built in the same order, starting with the groundwork, then the patio, paths, walls and fencing, and finishing with the planting. The easiest way to plan one is to follow that same order on paper. That way, you’ll have decided how you want to use the garden, and agreed the drainage and levels that go with it, before anyone starts digging. The planting then goes in once the heavy work is finished and the season is right.

Key Takeaways

  • Decide how the garden will be used, area by area, before choosing materials or plants.
  • Drainage, levels, cable runs and step heights need agreeing before the groundwork starts, because they all end up under the paving.
  • The built parts of the garden go in before any planting, so new plants aren’t trampled or buried by the heavy work.
  • October to April is the main planting window for trees and shrubs, which suits a build that finishes in autumn or winter.
  • A plan that’s settled before the first dig is the most reliable way to stop the cost and the timescale drifting.

At Olly Landscapes, we plan and build complete garden renovations across Bristol and the surrounding areas. We handle every stage with our own in-house team, from the groundwork through to the final planting, so there are no subcontractors involved. Every project starts with a free, no obligation consultation and quotation, including a site visit.

Because we carry out every stage ourselves, we plan each garden in the order it will be built. This means the decisions that affect the groundwork are made with the people who’ll actually be doing the work, and you can see from the start how each choice affects the rest of the project.

In this post, we explain how to plan a complete garden transformation in that same order, from the first site visit to the final inspection, using a garden we built in Hengrove as the worked example.

Start with How the Garden Will Be Used

At the first consultation, our landscaping team will talk through how you want to use your garden before getting into materials or planting, as this is what the rest of the plan is built around. It’s worth thinking about where you’d like to eat outside, where children or pets will play, where the bins and washing line need to go, which areas get the evening sun and how much time you want to spend on maintenance, as each of these has a practical impact on the design.

For example, a dining table needs a level patio with enough room to pull out the chairs, a lawn needs light and good drainage, a shed needs a solid base, and a washing line you’ll use in winter needs a hard path to reach it.

A garden we built in Hengrove, Bristol, is a good example of how this works in practice, as the homeowner came to us with a hand-drawn plan, which we then developed into separate areas for relaxing, entertaining and everyday use, with gentle curves to soften the rectangular shape of the garden.

You don’t need to be good at drawing to do the same, as even a rough sketch helps a garden designer in Bristol see how you want to use the space, and it’s much easier to move a line on paper than a patio once it’s been laid.

What the First Site Visit Should Cover

Once we know how you’d like to use the garden, we’ll visit to see what the ground itself will allow. Much of what we check ends up hidden once the garden is finished, so it’s important to understand it before we draw up a layout.

During the visit, we’ll usually look at:

  • How the garden falls, and whether it slopes towards the house or away from it.
  • Where water sits after heavy rain, and how quickly it drains.
  • How materials will reach the back garden: on a terraced street with no side access, this can mean everything coming through the house.
  • Where the existing drains and manhole covers are, since paving has to work around them.
  • Whether the soil is heavy clay, which holds water for longer and affects both the drainage plan and how long the groundwork takes.

Understanding these things before the layout is drawn means your garden transformation is designed around the ground you actually have, so any problems with drainage or access are planned for from the start rather than discovered once the digging has begun.

How We Build a Garden, Stage by Stage

We work through each garden project in a carefully planned order, starting with the groundwork and completing each stage before moving on to the next. This helps protect the work already done and means everything is finished properly.

As one in-house team carries out every stage, there’s no waiting for a different trade to turn up in between, and the people who set out your levels are the same people who lay the paving on top of them.

1. Groundwork

The first job is to clear the garden, dig it out and set the levels. While the ground is open, we also put in the drainage and any ducting needed for cables. Next comes the compacted stone layer beneath each patio and path, and a patio usually sits on 75 to 100mm of it, which stops the slabs sinking over time.

2. The Built Parts of the Garden

Once the base is ready, we build the patio, paths, steps, walls, fencing and decking, often known as hard landscaping. This stage involves the heaviest materials and the most traffic across the garden, so we complete it before anything is planted that could be damaged.

3. Planting and Finishing

Once the building work is finished, we improve the soil before the lawn and borders go in, and finish with the lighting and smaller details. Trees and shrubs are best planted between October and April, and anything newly planted will need regular watering during dry spells in its first year.

What You Need to Decide Before the First Dig

Some decisions might seem like small details, but they need to be made early in the project. Once the paving has been laid, making changes can mean taking up work that’s already been completed. That’s why it’s important to discuss and agree on the following details with us before the groundwork begins:

  • Lighting and outdoor sockets: The cable runs sit under the paving and through the borders, so their positions need planning with your electrician before the groundwork starts.
  • Levels and steps: On a sloping garden, the number of steps and the height of each terrace decide how much soil comes out and whether retaining walls are needed.
  • Where the water goes: Paving has to fall gently away from the house so rain runs off towards a drain or a planted bed, and the direction of that fall is set by the groundwork.
  • What stays: A tree you want to keep affects where machinery can go and how close the digging can come to its roots.
  • Materials: Porcelain and sandstone need different bedding and jointing, so the paving is chosen before the base is built. For help choosing a paving colour that suits your home, see our post: How To Create A Garden That Complements Your Home: The Top Paving Colour Options

How Long Does a Complete Garden Transformation Take?

The timescale for a garden renovation can vary quite a bit, depending on the size of the project, the condition of the garden and the work involved. A straightforward garden renovation can take one to two weeks on site, while a larger project can take four to six weeks or longer, and most of that difference comes down to the groundwork.

A sloping garden, heavy clay, a large tree to work around, or a garden that every barrow of stone has to reach through a side passage will all take longer than a level plot with easy access, even when the finished design is a similar size.

The weather can also affect the timescale, particularly during the groundwork stage. Digging and compacting waterlogged clay isn’t practical, so a spell of wet weather can push the timetable back, although rain makes much less difference once the paving is down.

For this reason, it’s best to treat any finish date as an estimate and to ask at the planning stage which parts of the garden will be out of use, and for how long.

Keeping the Budget and the Plan Together

Planning your garden renovation carefully from the start is one of the best ways to keep costs under control. Making changes once work is underway can be expensive, particularly if it means taking up paving that’s already been laid or adding lighting after the groundwork has been completed. By agreeing on the design, materials and other details before work begins, you can avoid unexpected costs and keep the project running smoothly.

It’s also worth asking for a quotation that breaks down the different stages of the project, so you have a clear idea of what’s involved and where your money is going. If your budget doesn’t stretch to completing the whole garden at once, you could consider leaving the planting until a later date. It’s generally better to complete the groundwork and hard landscaping together, rather than having to dig up the same areas twice.

For a closer look at what affects the cost of a garden renovation, read our guide: How Much Does It Cost to Landscape a Small Garden in Bristol?

Why Choose Olly Landscapes for Your Garden Transformation?

At Olly Landscapes, we know how much of a difference a well-planned garden can make to your home and how you enjoy spending time outdoors. From completely transforming a tired garden to creating a more practical space for your family, we can help you turn your plans into a garden that works for you.

We take care of every stage of your garden transformation, from the initial groundwork through to the finishing touches. With our own experienced team carrying out all the work, rather than relying on subcontractors, you’ll have the same people looking after your project from start to finish. We’re fully insured and focus on doing things properly, paying just as much attention to what’s underneath your new patio or lawn as we do to how the finished garden looks.

Working across Bristol and Bath, we offer a complete range of landscaping services, including patios, decking, fencing, driveways and lawns. Whatever you have in mind for your garden, we’d love to hear about your plans and help you create an outdoor space you’ll enjoy for years to come.

Planning Your Garden Before the Build Begins

The key to planning a complete garden transformation is working in the same order the garden will be built. It starts with thinking about how you want to use each part of the garden, and the site visit is then used to check the levels, drainage, access and soil. Anything that will sit underneath the paving, such as cable runs and step heights, can then be agreed before the groundwork begins, with the planting left until last so it goes into finished ground at the right time of year.

Planning this way gives you a quotation that follows each stage of the build and means far fewer changes once work has started, which helps keep the cost where it was agreed. Before your site visit, it’s worth writing down how you’d like to use the garden and noting where water collects after heavy rain, so we can turn your ideas into a layout and a detailed quotation.

Contact Us Today

To arrange a site visit and start planning your garden in the order it will be built, call 0117 463 4433 or send us a message through our contact page.

Frequently Asked Questions

Do You Design the Garden as Well as Build It?

Olly Landscapes draws up the layout and plans the drainage, levels, materials and planting before any work starts. The same in-house team then builds it, from the groundwork through to the final planting.

Will I See the Layout Before Work Starts?

The layout is drawn up and agreed at the planning stage, showing where each area and path will sit, so it can be changed on paper before anything is dug.

Can I Make Changes Once Work Has Started?

Changes to planting and finishing details can usually be made late in the job. Moving a patio or changing the levels is much harder once the groundwork is done, because everything below the surface has been built to the original layout.

How Much of the Garden Can I Use During the Work?

You’ll have little use of it during the groundwork, while the ground is open and materials are arriving. It becomes usable in stages as the paving and paths go down, and it’s worth agreeing beforehand where materials and any skip will sit.

 

 

 

 

Read More Blogs

landscaping company

How To Choose A Landscaping Company

Choosing a landscaping company? Learn what a quote should include, what affects cost and the questions worth asking before you hire anyone for your garden.
landscaping ideas Bristol

10 Landscaping Ideas for Bristol Gardens: The Most Common Garden Problems Solved

These 10 landscaping ideas Bristol each solve a common issue we see in the region, from a high-maintenance lawn to a driveway that's past its best.
small garden landscaping costs

How Much Does It Cost to Landscape a Small Garden in Bristol?

Explore what affects small garden landscaping costs in Bristol, from groundwork and access to materials, labour and the features you want to include.
Contact Us Today

Let’s Talk About Your Garden

Whether you already have plans in mind or need advice on where to start, speak to our team about your project today. We’ll discuss what you need, answer your questions and help you decide on the next steps.